What’s New

The ship is in for 1,500 hr mast, main rotor gear box and more .. back on the flightline 08-DEC-2023

Final BC Mountain Logo Final (1).png

Equipment on C-GINV

All of the equipment outside of the base equipment provided by Bell Flight at manufacture is listed and referenced here, including Pilot / Operating Manuals, Installation and Maintenance Manuals, Software Update Tools and Service Bulletins.   This covers Avionics and STC mods and well as field equipment.

Operating C-GINV

Pre-Flight, Startup and Runup, Shutdown and stowage checklists along with Pilot Operating Manuals.

Maintaining C-GINV

Maintenance Schedules, forward maintenance plans, and maintenance documentation can be found here. 

“An awesome ship to extend one’s experience operating experience, with the safest, widest used single-engine turbine out there”

-Happy Pilot

Work to Complete

  • Collection, Inventory and Stowage of historic tech, engine, airframe and Journey Logs (Colin, Sanch0, Steve)
  • Collection, Inventory and Stowage of available printed manuals (Steve and Sancho)
  • Single Missing POH Page (Steve, on order)
  • Generate Stowage Checklist (Hanger, Outdoor Mild, Outdoor Cold Weather) (Sancho, Colin, Steve)
  • Locate or rekey Cargo (Colin and Steve)
  • Update BCH Website and Operations to accommodate GINV (Sam)